-- card: 100096 from stack: in -- bmap block id: 73240 -- flags: 0000 -- background id: 3633 -- name: With Planned Dates 2 -- part 27 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 28 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=303 top=141 right=155 bottom=450 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: -- part contents for background part 6 ----- text ----- Slack time for a task is calculated to be the difference between the Latest Start date and the Earliest Start date and is shown as a shaded extension to the planned bars in the timelines. (In the Task Timeline, the slack applies to the task itself; in the Resource Timeline, the slack is for the resource’s work on the task.) MacProject II calculates a resource’s allocations from the Earliest Start dates of tasks to which the resource is assigned. -- part contents for background part 27 ----- text ----- Recalculating the Schedule -- part contents for background part 28 ----- text ----- With Planned Dates -- part contents for card part 27 ----- text ----- 2 of 2 -- part contents for card part 28 ----- text ----- Slack time planned for the task.